Dio vs Yak rnd 5 (cont)



Gunwales matched, laid up things to get a feel for it, and adjust beam positions. Made lotsa little marks all over it, x-ing this position, shift that one, etc.
Then pulled it all back apart so I can start cutting mortices. 9 deck beams ans 25 ribs. Thats 68 holes that need cut and cleaned up before I can start assembly. And before that assembly will be cutting the tenons on the deck beams, but it has to be racked back up and some other fiddly stuff done.
Holes
Lotsa holes in my future😞
Prolly not my favorite part of the build so far, but I can now SEE the yak at the end of the work.



